Write on

Category

Environment

INDUSTRIAL SEWAGE TREATMENT PLANT. AGUIÑO – RIVEIRA (A CORUÑA).

BARRAÑAMAR, S.L.

Engineering Design and Site Management. 

The industrial water comes from the Mussel Steaming Installation Barrañamar, with a volume of flow of 4 m3/h and it is treated in a processing line made of:

A pumping well for untreated water.

A brushing element made of a 1-mm-drum.

The homogenization is made in a 50-m3-tank, injecting air to avoid decomposition.  

The water is pumped with the dosing of coagulants, flocculants and neutralizers and it is treated by means of a 2-m-diameter DAF